Video Tutorial

Learn more about the software features with easy to follow video tutorials

4D-Gantt

  • The 4D-Gantt environment
    The interface and Gantt options for creating a WBS
    timeline add insert add activity delete move split connect
  • Creating a WBS
    How to add, insert and delete an activity, adding and deleting time-periods
    delete append structure delete move Work Breakdown Structure
  • Connecting objects to activities
    How to connect objects to specific periods in the Gantt diagram
    drag&drop connect and link
  • La Timeline
    Come visualizzare il progredire dell'opera nel 3D
    linea rossa pausa stop periodo