Video Tutorials

Discover the software features with our easy-to-follow video tutorials.


4D-Gantt

  • The 4D-Gantt environment
    The interface and Gantt options for creating a WBS
    timeline add insert add activity delete move split connect
  • Creating a WBS
    How to add, insert and delete an activity, adding and deleting time-periods
    delete append structure delete move Work Breakdown Structure
  • Connecting objects to activities
    How to connect objects to specific periods in the Gantt diagram
    drag&drop connect and link
  • The Timeline
    How to view project progression in 3D view
    line red pause stop period